  • Q How to deal with overheating of the winding during operation of the dry-type transformer?

    A Overheating of the winding may be caused by overload, poor heat dissipation or insulation aging. It is recommended to check the thermostat data regularly to ensure the three-phase temperature balance (≤155℃); clean the dust in the ventilation duct and cooling fan to maintain air circulation; if the insulation resistance of the winding is found to be reduced (megohmmeter is required for detection), it is necessary to turn off the power and dry it. Our company provides annual preventive maintenance services, including infrared thermal imaging detection, which can identify overheating hazards in advance.
  • Q What should I do if the oil-immersed transformer has oil leakage or abnormal oil level?

    A Oil leakage is mostly caused by aging of seals or loose welding points. Our company promises to respond within 48 hours and arrive on site within 24 hours in the province. If the oil level is abnormal, check the status of the oil storage cabinet capsule/diaphragm and the smoothness of the respirator, and replenish or replace the transformer oil if necessary. For oil-immersed transformers, our company provides oil sample testing services, and predicts internal faults (such as inter-turn short circuits) through chromatographic analysis. Historical data shows that the fault identification accuracy rate is 92%.
  • Q How to deal with power outages caused by substation bus failure?

    A Bus failures may be caused by short circuits, insulator flashovers or operating errors. Our company provides 7×24 hours emergency response, equipped with mobile inspection vehicles and spare parts warehouses to ensure that power is restored within 48 hours. For substation customers, our company provides customized maintenance solutions, including bus infrared temperature measurement, insulator cleaning and DC system grounding detection. The bus fault repair time has increased by 40% in the past three years.
  • Q Is there a charge for maintenance during the transformer warranty period?

    A Our company strictly implements the distinction between "guarantee repair" and "warranty": during the warranty period, for faults caused by manufacturing defects (such as multi-point grounding of the core, DC resistance of the winding exceeds the standard), free maintenance and parts replacement are provided; due to improper use (such as overload operation) or outside the warranty period, only the material cost is charged. All services are accompanied by test reports and fee details to ensure transparency and compliance.
  • Q How to extend the design life of the transformer to 30 years?

    A
    Full-cycle management is required:
     
    Operation phase: Install the EHMS online monitoring system to track insulation status, load rate and temperature data in real time;
    Maintenance phase: Perform a core inspection every 3 years, focusing on the insulation resistance of the core clamps (need to be ≥200MΩ) and the deformation of the windings;
    Upgrade phase: After 15 years of use, intelligent transformation services can be provided, and IoT modules and intelligent temperature control units can be added. Our company's historical data shows that the actual life of equipment that has been properly maintained can reach 32-35 years, far exceeding the industry standard.
  • Q How can I to be your agent in my country?

    A We welcome distributors in various countries to cooperate with us. Sales is an important assessment criterion. According to different requirements of different countries, new and old customers are welcome to consult! 
  • Q How long it takes you to provide the designing options for us?

    A We have a professional design team. Our models and spare parts are self-developedand produced. We can provide you with ODM services. The general time limit is 25-35 days.
  • Q Will you will attend the fair to show your products?

    A Yes, we participate in 3-4 international exhibitions every year, such as the USA IEEE P&D, the Middle East Dubai Electricity Show, the Asian Electricity Show, etc. A series of different exhibitions, and we look forward to seeing each other at the exhibition! 
  • Q Can they adapt to harsh conditions like high temperature and humidity?

    A Customizable protection level (up to IP65) and temperature-resistant materials, suitable for -40to 60extreme environments, meeting strict industrial needs
  • Q How to determine the suitable power and voltage parameters?

    A Provide load type, working environment, installation space and other info, our engineers offer free customization plans for precise matching.
Subscribe To Our Newsletter
Promotions, new products and sales. Directly to your inbox.

Quick Links

Product Category

Contact Info
Contact Person: Elaine Xiong
Tel: 0086 18127694078
E-mail:qianhongelectric@gmail.com
Add: No. 11, Dongshao Avenue, Qujiang District, Shaoguan City, Guangdong Province
Copyright © 2025 Guangdong Qianhong Electric Technology Co., Ltd. All Rights Reserved.| Sitemap | Privacy Policy